Overview
Incline/Decline Sets
Incline/Decline Sets are the ideal way to alter the elevation of your track quickly and easily. Each set includes the high-density foam pieces necessary to raise or lower the elevation of your track. Incline/Decline Sets come in either 2%, 3% or 4% grades.
Sets can start an incline at 0″ and reach a maximum height of 4 1/2″ (11.4 cm). Declines can start at a maximum height of 4 1/2″ (11.4 cm) and lower to 0″. Actual measurements depend on the grade used.
NOTE: One Set only includes foam pieces necessary either to create an incline OR create a decline. One Set cannot do both. You will need two Sets to create both an incline and a decline on your layout.
To install Incline/Decline Sets, pin in place with Foam Nails and attach with Foam Tackâ„¢ Glue or the Low Temp Foam Glue Gun and Glue Sticks
ST1416 – 3% Incline/Decline Set – 6 sections raise/lower 4 1/2″ (11.4 cm) in a 12′ (3.65 m) run each section measuring 2 1/2″ w x 24″ l (6.35 x 60.9 cm)
Product Videos
Building a Layout Overview
Inclines
See how Inclines take your track from one level to another in both straight and curved areas, without you having to make the complicated calculations usually required to create grades and curves.
SubTerrain Demonstration
Learn how to build a model railroad layout in five easy steps with the revolutionary SubTerrain Lightweight Layout System.
Modifying Risers and Inclines
Learn to bevel, widen, narrow and bank Risers and Inclines to fir the tracking and road requirements of your layout.
Add a Building & Road to an Existing Layout
Learn how to build a model railroad layout in five easy steps with the revolutionary SubTerrain Lightweight Layout System.



















Reviews
There are no reviews yet.